More than 7 200 m2 production areas, fully owned by «Ukrneftemash EPC» LLC., which is situated in Ukraine, Kharkov, Simpheropolsky lane, 6, on the territory of the famous plant «Self-propelled chassis» JSC. Plant area comprises 10.6 hectares, land-to-building ration – 0.5. The enterprise is arranged in 2 premises. Premise 1 is specialized in pressure vessels and columns production, shell and tube heat exchangers and air coolers. Premise 2 is the assembly shop, which manufactures frame blocks and ready units are installed in the frames. We have strong production capacity and are focused on innovative technologies development and implementation in the field of industrial equipment. Production facilities allow us to perform the following activities:
- sheet metal of 2000 mm width and up to 16 mm thickness cutting
- apparatus flanges, heat exchangers tube boards up to DN 55 mm drilling;
- sheet stocks with diameter up to 25 mm drilling;
- flanges with diameter up to 1200 mm production;
- shells production of sheet metal with width up to 2000 mm and thickness up to 16 mm;
- tube bundles, heat exchangers casings, evaporators assembly
- blanks cutting of angle bars, bars and flat bars;
- apparatus casings, furnaces, frames, tubing production;
- heat insulation parts production;
- ready unit pneumatic testing.
Since 2004 company specialists designed and constructed the following objects:
2004 Oil treatment and processing unit 15 th. tones per year for «Evenk fuel and energy company» JSC, Russian Federation, Krasnoyarsk region, Vanavara.
2007 Oil processing unit 40 th. tones per year «Promtechinvest» LLC., Russian Federation, Voronezh.
2008 Hydrocarbon crude processing unit 30 th. tones per year «Solntsedar SPE», Solntsedarovka, Kharkov region, Ukraine.
2008 Crude oil processing unit modernization 300 th. tones per year «Kant oil refinery» JSC, Kirgshelk, Kyrgyz Republic.
2009 Crude oil processing unit modernization 160 th. tones per year «SМU2004» LLC., Guriev, Kaliningrad region, Russian Federation.
2010 Crude oil processing unit40 th. tones per year «KMNPZ» LLP., Qyzylorda, Republic of Kazakhstan.
2011-2012 Five crude oil processing units 40 th. tones per year «В.N. Munai Gas Ltd» Uralsk, Republic of Kazakhstan.
2012 Crude oil processing unit40 th. tones per year «KMNPZ» LLP., Qyzylorda, Republic of Kazakhstan.
2012 Crude oil processing unit50 th. tones per year «NurNeftegas» LLC., Balykchi, Kyrgyz Republic.
2012 Five crude oil processing units 50 th. tones per year, Khairaton, Afghanistan.
2013 Hydrocarbon crude treatment unit with capacity of 125 th. tons per year, Shymkent, Kazakhstan.
2013 Construction project development for Hydrocarbon crude processing complex for EURO-4 fuels production, (with possibility of development up to 1 mln. tons per year capacity) Autonomous Kurdistan, Iraq.
2014 Construction project development for PVC pipe works, Autonomous Kurdistan, Iraq.
2015 Construction project development for Hydrocarbon crude processing complex for EURO-4 fuels production, with capacity of 300 th. tons per year, Tursunzade, Republic of Tadzhikistan
2015 Construction project development for Hydrocarbon crude processing complex for EURO-4 fuels production, with capacity of 130th. tons per year, Aktau, Kazakhstan.
2015 Construction project development for Hydrocarbon crude processing complex for EURO-4 fuels production, with capacity of 65 th. tons per year, Suleimany, Iraq.
2016 Two crude oil processing units with capacity of 5 m3 per hour, West Africa, Republic of Ghana.
2016 Production of processing equipment set (Shymkent, Kazakhstan).